Draft NSW GAB Shallow water resource plan components for consultation
If you require assistance in reading these documents, please contact +61 2 9338 6600 or water.relations@dpi.nsw.gov.au
Title | Description |
---|---|
This water resource plan has built on existing water planning arrangements such as the statutory water sharing plans. The plan consists of the main body water resource plan (Chapters 1 to 8), accompanying Schedules (A to I) and Appendix A. You can read them by clicking on the links below. | |
Schedule A: Water Sharing Plan for NSW Great Artesian Basin Shallow Water Sources | This Plan replaces the Water Sharing Plan for the NSW Great Artesian Basin Shallow Groundwater Sources 2011 in relation to the NSW Great Artesian Basin Shallow Groundwater Sources. See WSP rule changes fact sheet to assist you in making informed comment. |
Identifies the person responsible for implementation measures associated with each requirement in Chapter 10 of the Basin Plan. | |
Report on the consultation undertaken in the NSW GAB Shallow water resource plan area as part of the WRP process, including the Aboriginal Nation consultation. | |
The NSW Great Artesian Basin Shallow Risk Assessment has been prepared as a component of the water resource plan and identifies potential and emerging risks to water resources. | |
This schedule includes an incident response guide for managing access to water during extreme events. An extreme event is a severe water shortage or water quality event. | |
This schedule is the Water Quality Management Plan for the water resource plan area, as required by the Basin Plan. | |
Schedule G: Information and methods used in preparing the water resource plan | This schedule details the data sets, methods and other key policy and information sources used in formulating the water resource plan. |
This schedule details the arrangements for environmental monitoring, evaluation and reporting of water take as well as the resource itself (water flows or levels, and where applicable water quality and of water dependent ecosystems). | |
This schedule contains more detailed on Chapter 5 of the water resource plan and includes detailed methods for determining the actual annual take, annual permitted take and compliance with sustainable diversion limits. | |
Appendix A: NSW Great Artesian Basin Shallow Water Resource Plan Area Description | The water resource description provides a comprehensive overview of the NSW Great Artesian Basin Shallow water resource plan area. |