Draft Namoi Alluvium water resource plan components for consultation
If you require assistance in reading these documents, please contact +61 2 9338 6600 or water.relations@dpi.nsw.gov.au
Title | Description |
---|---|
This water resource plan has built on existing water planning arrangements such as the statutory water sharing plans. The plan consists of the main body water resource plan (Chapters 1 to 8), accompanying Schedules (A to I) and Appendix A. You can read them by clicking on the links below. | |
Schedule A: Draft Water Sharing Plan for NSW Namoi Alluvial Groundwater Sources 2019 | This Plan replaces the Water Sharing Plan for the Upper and Lower Namoi Groundwater Sources 2019 in relation to the Lower Namoi and Upper Namoi Zones 1 - 12 Groundwater Sources, the Water Sharing Plan for the Namoi Unregulated and Alluvial Water Sources 2012 in relation to the Manilla Alluvial, the Currabubula Alluvial, the Quipolly Alluvial and the Quirindi Alluvial Groundwater Sources, and the Water Sharing Plan for the Peel Valley Regulated, Unregulated, Alluvium and Fractured Rock Water Sources 2010 in relation to the Peel Alluvium Water Source. See WSP rule changes fact sheet to assist you in making informed comment. |
Schedule B: Water Resource Plan Index—appears in WRP on page 79 | Identifies the person responsible for implementation measures associated with each requirement in Chapter 10 of the Basin Plan. |
Report on the consultation undertaken in the Namoi Alluvium water resource plan area as part of the water resource plan process, including the Aboriginal First Nation consultation. | |
The Namoi Alluvium Risk Assessment has been prepared as a component of the water resource plan and identifies potential and emerging risks to water resources. | |
This schedule is the Water Quality Management Plan for the water resource plan area, as required by the Basin Plan. | |
The NSW Namoi Alluvium Groundwater Water Quality Management Plan has been prepared as a component of the WRP and identified risks to water quality and potential strategies to manage these. | |
Schedule G: Information and methods used in preparing the WRP | This schedule details the data sets, methods and other key policy and information sources used in formulating the water resource plan. |
This schedule details the arrangements for environmental monitoring, evaluation and reporting of water take as well as the resource itself (water flows or levels, and where applicable water quality and of water dependent ecosystems). | |
This schedule contains more detailed on Chapter 5 of the water resource plan and includes detailed methods for determining the actual annual take, annual permitted take and compliance with sustainable diversion limits. | |
Appendix A: Namoi Alluvium water resource plan area description | The water resource description provides a comprehensive overview of the Namoi alluvium water resource plan area |