Eligible EOI applicants
EOI applications (Stage 1) are assessed by the Technical Review Panel for eligibility to proceed to the Detailed Application stage (Stage 2). The following EOIs have been assessed by the Technical Review Panel as being eligible to proceed to the Detailed Application stage.
Note – EOI eligibility is not an approval for funding.
As at 31 July 2018
Application number | Applicant | Project | Description | Project phase applied for |
---|---|---|---|---|
SSWP001 | Tamworth Regional Council | Manilla Water Treatment Plant Construction | Construction of a new Water Treatment Plant at Manilla to meet ADWG Guidelines and increase capacity for existing and future demands | Detailed Design and Construction |
SSWP002 | Bathurst Regional Council | Winburndale Dam Flood Safety Upgrade | Strengthen the dam wall to improve flood safety while retaining the existing storage capacity | Detailed Design and Construction |
SSWP003 | Gunnedah Shire Council | Curlewis Water Supply Pipeline | Construction of a 15.8 km pipeline to improve water security and quality at the township of Curlewis | Detailed Design and Construction |
SSWP006 | Cobar Shire Council | Nymagee Water Security | Identification of secure water source/s for Nymagee village | Scoping Study |
SSWP007 | Cobar Shire Council | Euabalong and Euabalong West Water Quality and Security | Construction of two bores to replace existing raw water supplies to improve water security and quality | Business Case |
SSWP009 | Warrumbungle Shire Council | Binnaway Sewerage Scheme | Construction of a sewage collection/reticulation system and Sewage Treatment Plant for the township of Binnaway | Business Case |
SSWP010 | Narromine Shire Council | Sustainable Narromine Water Supply | Investigation into additional bore and water treatment facility to improve water security for Narromine | Scoping Study |
SSWP012 | Muswellbrook Shire Council | Denman Sewage Treatment Plant Upgrade | Improving the performance of the Denman Sewage Treatment Plant by constructing new components and upgrading some existing components | Business Case |
SSWP013 | Eurobodalla Shire Council | Nelligen Water Supply and Sewerage Schemes | Construction of reticulated water supply and sewerage for Nelligen | Detailed Design and Construction |
SSWP014 | Walgett Shire Council | Walgett Weir | Construction of a fishway at the Walgett Weir as part of the larger Walgett Weir Water Supply Security Project | Detailed Design and Construction |
SSWP016 | Eurobodalla Shire Council | Akolele Sewerage Scheme | Construction of a pressure sewer system at Akolele | Detailed Design and Construction |
SSWP017 | Eurobodalla Shire Council | Eurobodalla Unserved Villages - Feasibility | Investigation of provision of sewerage services to unsewered villages of South Durras, Congo, Mystery Bay, Central Tilba and Tilba Tilba | Scoping Study |
SSWP018 | Tweed Shire Council | Tweed District Water Supply - Mitigation of the Risk of Salt Water Contamination | Investigation of the mitigation of the risk of salt water contamination of the Tweed District drinking water supply | Scoping Study |
SSWP023 | Walgett Shire Council | Collarenebri Pre-treatment and Sludge Handling | Investigation of existing infrastructure and options to improve pre-treatment at the Collarenebri Water Treatment Plant to reduce water quality risk | Scoping Study |
SSWP025 | Coolamon Shire Council | Coolamon Sewerage Augmentation | Augmentation of the existing Coolamon Sewage Treatment Plant to improve treatment process | Business Case |
SSWP026 | Wentworth Shire Council | Wentworth Water Treatment Plant Augmentation | Identification of infrastructure deficiencies at the Wentworth Water Treatment Plant and development of options to improve facility | Scoping Study |
SSWP027 | Snowy Monaro Regional Council | Bombala Sewerage Augmentation | Augmentation of the existing Sewage Treatment Plant to improve treatment process | Detailed Design and Construction |
SSWP028 | Kempsey Shire Council | Crescent Head Water Treatment Plant | Construction of a new Water Treatment Plant to supply Crescent Head | Detailed Design and Construction |
SSWP029 | Oberon Council | Oberon and East Oberon Sewerage Scheme | Augmentation of the existing Sewage Treatment Plant to improve treatment process and construction of a reticulation system at East Oberon | Detailed Design and Construction |
SSWP030 | Wentworth Shire Council | Gol Gol Water Treatment Plant | Installation of automated electrical and telemetry control systems at the Gol Gol Water Treatment Plant to improve water quality and safety | Detailed Design and Construction |
SSWP031 | Lockhart Shire Council | Lockhart Sewage Treatment Plant | Construction of a new Intermittently Decanted Extended Aeration treatment process to replace existing trickling filter | Scoping Study |
SSWP032 | Coonamble Shire council | Gulargambone and Quambone Drinking Water Improvement | Installation of chlorine monitoring and telemetry equipment | Business Case |
SSWP033 | Walgett Shire Council | Lightning Ridge Water Supply Upgrade | Construction of a cooling tower and disinfection system | Detailed Design and Construction |
SSWP034 | Port Macquarie-Hastings Shire Council | Port Macquarie-Hastings Bulk Water Filtration Plant | Investigations into options for bulk water treatment for the Port Macquaire-Hastings LGA | Scoping Study |
SSWP036 | Carrathool Shire Council | Rankins Springs Water Upgrades | Rehabilitation and capacity improvement of raw water storage dams, including strengthening, desilting and sealing to prevent water loss | Scoping Study |
SSWP037 | Bogan Shire Council | Nyngan Water Treatment Plant and Distribution System Upgrade | Upgrade of treatment facilities at the Nyngan Water Treatment Plant | Detailed Design and Construction |
SSWP038 | Gilgandra Shire Council | Gilgandra Water Supply Augmentation | Construction and augmentation of reticulation system and Gilgandra Water Treatment Plant | Business Case |
SSWP039 | Gilgandra Shire Council | Gilgandra Sewerage System Rehabilitation | Construction of a new Sewage Treatment Plant, pumping stations, sewer mains and associated works | Business Case |
SSWP041 | Richmond Valley Shire Council | Casino Secure Water Supply | Options assessment study for a secure emergency raw water supply for Casino | Scoping Study |
SSWP042 | Griffith City Council | Griffith Water Treatment Plant Upgrades | Upgrades of filtration system, dissolved air flotation system, powdered activated carbon dosing system and raw water storage at Griffith Water Treatment Plant | Scoping Study |
SSWP044 | Wingecaribee Shire Council | Bowral Sewage Treatment Plant | Upgrade of existing Sewage Treatment Plant to increase treatment capacity and improve effluent quality | Detailed Design and Construction |
SSWP045 | Central Tablelands Water | Central Tablelands Water Security | Construction of a new 12ML reservoir at Carcoar Water Treatment Plant and construction of a new 23km pipeline from Gooloogong to Glenfell | Detailed Design and Construction |
SSWP046 | Nambucca Shire Council | Bowraville Off-River Storage Dam | Scoping study to address water quality for the Nambucca Shire water supply system | Scoping Study |
SSWP047 | Gwydir Shire Council | Bingara Sewerage Extension | Provision of reticulated sewerage to East Bingara and North Bingara villages. Includes upgrade of some facilities at the Bingara Sewage Treatment Plant | Business Case |
SSWP048 | Narrabri Shire Council | Narrabri Sewage Treatment Plant | Upgrade of existing Sewage Treatment Plant to contemporary standards, including addressing Workplace Health and Safety requirements | Business Case |
SSWP049 | Bourke Shire Council | Charles Street Reservoir Renewal | Renewal of the existing Charles Street reservoir to improve drinking water quality | Detailed Design and Construction |
SSWP051 | Bourke Shire Council | Safe and Secure Water for Rural and Remote Villages of the Bourke LGA | Construction of new bores at Byrock, Enngonia, Louth and Wanaaring villages | Detailed Design and Construction |
SSWP053 | Bega Valley Shire Council | Brogo-Bermagui Water Treatment Plant | Construction of a new Water Treatment Plant to service Brogo-Bermagui | Detailed Design and Construction |
SSWP054 | Coonamble Shire Council | Coonamble Sewage Treatment Plant | Scoping study to investigate replacement of the Coonamble Sewage Treatment Plant | Scoping Study |
SSWP055 | Wingecaribee Shire Council | Moss Vale Sewage Treatment Plant | Upgrade of existing treatment facilities at the Moss Vale Sewage Treatment Plant, including construction of an additional IDEA tank | Detailed Design and Construction |
SSWP056 | Tweed Shire Council | Provision of Water Security links to SEQ Water Grid | Scoping study to investigate links to SEQ Water to provide water security for Tweed Shire Council | Scoping Study |
SSWP058 | Snowy Monaro Regional Council | Adaminaby Sewage Treatment Plant Upgrades | Construction of a modern IDEA tank and associated upgrade works | Detailed Design and Construction |
SSWP059 | Armidale Regional Council | Dumaresq Dam Safety Upgrade | Dam upgrade works at Dumaresq Dam to reduce flood consequence hazard | Detailed Design and Construction |
SSWP060 | Armidale Regional Council | Armidale Wastewater Campus Project | Augmentation of existing Sewage Treatment Plant and effluent irrigation infrastructure, including provision of modern technologies | Business Case |
SSWP061 | Armidale Regional Council | Puddledock Dam Raw Water Transfer System Augmentation | Augmentation of the raw water transfer system for Puddledock Dam to improve reliability as a backup supply | Business Case |
SSWP062 | Warrumbungle Shire Council | Baradine Water Treatment Plant Upgrade | Augmentation of the existing Water Treatment Plant with a new clarification unit | Detailed Design and Construction |
SSWP063 | Warrumbungle Shire Council | Mendooran Water Supply Modification Upgrade | Upgrade of the existing Water Treatment Plant to redesign, reconfigure and replace elements to improve treatment process by addressing process control, operation, and automation issues | Business Case |
SSWP064 | Warrumbungle Shire Council | Mendooran Sewage Scheme | Scoping study to identify and develop cost effective options for a suitable sewerage scheme at Mendooran | Scoping Study |
SSWP065 | Gwydir Shire Council | Gravesend Water Supply Upgrade | Scoping study to investigate water treatment options for Gravesend | Scoping Study |
SSWP066 | Warrumbungle Shire Council | SCADA and Telemetry Network Upgrade - Design and Construct | Replacement of two existing SCADA systems and telemetry networks to facilitate holistic LGA management of water and wastewater networks | Detailed Design and Construction |
SSWP070 | Bega Valley Shire Council | Bega/Tathra Water Treatment Plant | Construction of a Water Treatment Plant to service Bega/Tathra, including water stabilisation, chlorination and fluoridation | Scoping Study |
SSWP071 | Bega Valley Shire Council | Yellow Pinch Dam Water Treatment Plant | Scoping study to investigate construction of a Water Treatment Plant at Yellow Pinch Dam to service 12,000 people in the southern portion of the Bega Valley LGA | Scoping Study |
SSWP072 | Murrumbidgee Irrigation Limited | East Mirrool En-route Surge Reservoir | Construction of a 1,500 ML gravity-fed en-route storage to secure town water supply for Griffith, Yenda and irrigation farms | Detailed Design and Construction |
SSWP073 | Murrumbidgee Irrigation Limited | Roaches En-route Surge Reservoir | Construction of a 3,000 ML en-route storage to secure town water supply for Leeton, surrounding villages and irrigation farms | Detailed Design and Construction |
SSWP074 | Upper Hunter Shire Council | Upper Hunter Water Supply and Water Treatment | Scoping study to review options for supplying drinking water to Upper Hunter townships from Glenbawn Dam, including catchment, water quality and hydraulic assessment | Scoping Study |
SSWP075 | Snowy Monaro Regional Council | Jindabyne and Jindabyne East Water Filtration Plants | Scoping study to investigate augmentation of the Jindabyne Water Intake Pump Station, construction of a filtration plant, and recommissioning of the High Zone Reservoir to service Jindabyne and Jindabyne East | Scoping Study |
SSWP076 | Kempsey Shire Council | Willawarrin WTP | Design and construction of a new 0.2 ML/d WTP and associated works | Design and Construction |
SSWP078 | Essential Water | Replacement and Augmentation of Menindee Water Treatment Plant | Construction of a new 2 ML/day Water Treatment Plant at Menindee to serve Menindee and Sunset Strip villages, and decommissioning of the existing Sunset Strip Water Treatment Plant | Design and Construction |
SSWP079 | Essential Water | Willis Street STP | Construction of a modern IDEA tanks and associated works | Business Case Development |
SSWP080 | Narromine Shire Council | Tomingley WS Augmentation | Construction of a new Water Treatment Plant | Design and Construction |
SSWP083 | Dubbo Regional Council | Upgrading of Sewer R, Dubbo | Construction of a new 3.5 km main | Design and Construction |
SSWP084 | Upper Hunter Shire Council | Scone STP Augmentation | Replacement an old trickling filter plant with a new treatment process plant and associated works | Design and Construction |
SSWP085 | Federation Council | Mulwala STP - Irrigation of Yarrawonga Mulwala Golf Course | Construction of a pump station and transfer main from the existing Mulwala STP to the adjacent Yarrawonga and Border Golf Club course | Business Case Development |
SSWP090 | Cobar Shire Council | Cobar WS Storage Security | Upgrade works at two potable water supply reservoirs | Design and Construction |
SSWP091 | Parkes Shire Council | Parkes Town Water Security Program | Provision of Lachlan to Parkes water supply duplication, Lachlan Bore Fields Expansion, and Forbes to Parkes to Gooloogong CENTROC Water Grid Pipeline | Business Case Development |
SSWP092 | Coonamble Shire Council | Quambone Water Security | Construction of a second groundwater bore | Project Scoping Studies |
SSWP093 | Coonamble Shire Council | Coonamble Water Security | Construction of an additional groundwater bore | Project Scoping Studies |
SSWP094 | Coonamble Shire Council | Coonamble and Gulargambone Hospital Water Security | Construction of a secondary water supply pipeline for each hospital and surrounding communities | Project Scoping Studies |
SSWP095 | Central Darling Shire Council | Wilcannia Township Gravity Sewer Scheme | Provision of a gravity sewerage system for the Wilcannia township | Project Scoping Studies |
SSWP099 | Coonamble Shire Council | Coonamble Water Supply Capacity Upgrade | Construction of a new 5ML water reservoir | Project Scoping Studies |
SSWP100 | Central Tablelands County Council | Lithgow to Kings Plains Water Transfer Pipeline | Construction of a pipeline to transfer approximately 8 GL pa of excess water at Centennial's Springvale mine near Lithgow to the headwaters of the Belubula River near Kings Plains, in order to supplement storage in Carcoar Dam | Project Scoping Studies |
SSWP101 | Bogan Shire Council | Nyngan Cobar Water Security Project | Provision of water security for Nyngan and Cobar region including construction of - 700 ML Storage 1B, pipeline along Albert Priest Channel and Borefield | Business Case Development |
SSWP102 | Hay Shire Council | Hay Water Treatment Plant - upgrade | Upgrading existing laboratory facilities including instrumentation | Project Scoping Studies |
SSWP103 | Tweed Shire Council | Raising of Clarrie Hall Dam | Raising of Clarrie Hall Dam to provide water security and protection from salt water contamination | Business Case Development |
SSWP104 | Tweed Shire Council | Uki Water Treatment Plant Upgrade | Augmentation of the existing Water Treatment Plant including replacement of membranes, coated media filter, UV system and other associated works | Design and Construction |
SSWP105 | Lachlan Shire Council | Condobolin Water Supply System Upgrade | Undertake investigations to determine the best option for improving water security and safety for the Condobolin Water Supply system | Project Scoping Studies |
SSWP106 | Lachlan Shire Council | Condobolin Sewerage Scheme Upgrade | Undertake investigations into the upgrade of the Condobolin Sewerage Scheme | Project Scoping Studies |
SSWP107 | Tamworth Regional Council | Tamworth Raw Water Harvesting Efficiency and Production Security Project | Construction of a 120 ML water storage | Design and Construction |
SSWP108 | Walcha Shire Council | Walcha Town Water Security | Undertake investigations into town water security for Walcha | Project Scoping Studies |
SSWP109 | Armidale Regional Council | Guyra STP - Augmentation | Undertake investigations to facilitate effluent reuse and upgrading facilities at the existing Sewerage Treatment Plant | Project Scoping Studies |
SSWP110 | Walcha Shire Council | Walcha WTP - Augmentation | Undertake process assessment/audit report for the identification of upgrade and refurbishment works required to comply with the Australian Drinking Water Guidelines | Project Scoping Studies |
SSWP112 | Kempsey Shire Council | Steuart McIntyre Dam Augmentation | Construction of a new Balance Tank, chlorination and fluoridation facilities at the existing Steuart McIntyre Dam | Design and Construction |
SSWP113 | Orange City Council | Gosling Creek Dam - Investigations and Options Study | Undertake investigations and assessment of the safety of the Gosling Creek Dam | Project Scoping Studies |
SSWP115 | Warrumbungle Shire | Eight off Water Supply System Instrumentation, Monitoring and Automation Upgrades | Provision of instrumentation, monitoring and automation at four Water Treatment Plants and four disinfected bore water supplies in the Warrumbungle Shire Council area | Project Scoping Studies |
SSWP116 | Goulburn Mulwaree Council | Southern Tablelands Water Reuse Infrastructure Scheme Stage 2 - Goulburn Reuse Scheme | Construction of an effluent reuse system to supply treated effluent for sporting fields and parks | Business Case Development |
SSWP117 | Central Coast Council | Mardi Water Treatment Plant Upgrade | Undertake upgrades and associated works at the existing Mardi Water Treatment Plant | Design and Construction |
SSWP118 | Hilltops Council | Boorowa Drought Security Project | Construction of a new bulk water supply pipeline from Harden to Boorowa | Business Case Development |
SSWP119 | Yass Valley Council | Yass Valley Council IWCM Review and Background investigations | Undertake feasibilities studies for a review and update of the Integrated Water Cycle Management strategy | Project Scoping Studies |
SSWP120 | Yass Valley Council | Gundaroo Sewerage Scheme | Construction of a new reticulation system, transferring system and a new STP | Business Case Development |
SSWP121 | Yass Valley Council | Yass Water Treatment Plant Water Quality Improvement Plant | Undertake augmentation works at the existing Yass WTP | Business Case Development |
SSWP122 | Goulburn Mulwaree Council | Goulburn Water Augmentation Scheme | Undertake augmentation of the Goulburn Water Scheme | Business Case Development |
SSWP124 | Dubbo Regional Council | Geurie Water Supply Feasibility Study | Feasibility study comparing into Geurie water supply upgrade options | Project Scoping Studies |
SSWP125 | Mid Coast Council | Gloucester Water Supply Scheme - Connection to Manning Scheme and New Reservoir | Construction of 37 km pipeline from Krambach to Gloucester, including balance tanks and pump stations | Design and Construction |
SSWP129 | Lower Macquarie Water Utilities Alliance | LMWUA - Condition Assessment of Existing Groundwater Bores | Undertake condition assessment of approximately 40 bores, to identify and prioritise infrastructure renewals to address water security and quality | Project Scoping Studies |
SSWP131 | Wentworth Shire Council | Lower Darling Water Supply Security Project | Assess viable options for the provision of a safe and reliable water supply for Pooncarie and the Lower Darling region. | Project Scoping Studies |
SSWP133 | Singleton Shire Council | Singleton Council SCADA and Telemetry network upgrade | Audit of 57 sites to review current SCADA, Telemetry and PLC systems, and gap analysis, to plan a migration path from old system to new system with improved reliability and functionality | Project Scoping Studies |
SSWP134 | Leeton Shire Council | Replacement of the Leeton Water Treatment Plant | Construction of a new water treatment plant at Leeton | Project Scoping Studies |
SSWP135 | Carrathool Shire Counci | Rehabilitation of Palmyra Dam Water Storage and Filtration System Upgrades | Undertaken scoping study to explore and compare options whether to rehabilitate Palmyra water storage dam or construct a new dam beside it to increase storage capacity to allow Council to store adequate water for Goolgowi-Yoolaroi water schemes | Project Scoping Studies |
SWP138 | Upper Hunter Shire Council | Scone to Murrurundi Pipeline - Village Reticulation and Reservoirs for Parkville, Wingen and Blandford | Design and construction of new reticulated water systems for the three villages of Parkville, Wingen and Blandford and an additional reservoir/s in Murrurundi to provide additional water storage to serve these villages. | Design and Construction |
SSWP139 | Central Darling Shire Council | Ivanhoe Water Treatment Plant Augmentation | Construction of a new Ivanhoe WTP to meet the contemporary standards, to address water quality and public health issues, to improve WHS and operational costs. | Design and Construction |
SSWP140 | Central Darling Shire Council | Wilcannia Water Treatment Plant Augmentation | Construction of a new Wilcannia WTP to meet the contemporary standards, to address water quality and public health issues, to improve WHS and operational costs. | Design and Construction |
Page link: https://www.industry.nsw.gov.au/water/plans-programs/infrastructure-programs/safe-and-secure-water-program/about/eligible-eois