Eligible EOI applicants

As at March 2018, the following EOIs have been assessed by the Technical Review Panel as being eligible to progress to the detailed application stage.

Important: EOI eligibility is not an approval for funding.

Application numberApplicantProjectDescription Project phase applied for
SSWP001 Tamworth Regional Council Manilla Water Treatment Plant Construction Construction of a new Water Treatment Plant at Manilla to meet ADWG Guidelines and increase capacity for existing and future demands Detailed Design and Construction
SSWP002 Bathurst Regional Council Winburndale Dam Flood Safety Upgrade Strengthen the dam wall to improve flood safety while retaining the existing storage capacity Detailed Design and Construction
SSWP003 Gunnedah Shire Council Curlewis Water Supply Pipeline Construction of a 15.8km pipeline to imrpvoe water security and quality at the township of Curlewis Detailed Design and Construction
SSWP006 Cobar Shire Council Nymagee Water Security Identification of secure water source/s for Nymagee village Scoping Study
SSWP007 Cobar Shire Council Euabalong and Euabalong West Water Quality and Security Construction of two bores to replace existing raw water supplies to improve water security and quality Business Case
SSWP009 Warrumbungle Shire Council Binnaway Sewerage Scheme Construction of a sewage collection/reticulation system and Sewage Treatment Plant for the township of Binnaway Business Case
SSWP010 Narromine Shire Council Sustainable Narromine Water Supply Investigation into additional bore and water treatment faciliy to improve water security for Narromine Scoping Study
SSWP012 Muswellbrook Shire Council Denman Sewage Treatment Plant Upgrade Improving the performance of the Denman Sewage Treatment Plant by constructing new components and upgrading some existing components Business Case
SSWP013 Eurobodalla Shire Council Nelligen Water Supply and Sewerage Schemes Construction of reticulated water supply and sewerage for Nelligen Detailed Design and Construction
SSWP014 Walgett Shire Council Walgett Weir Construction of a fishway at the Walgett Weir as part of the larger Walgett Weir Water Supply Security Project Detailed Design and Construction
SSWP016 Eurobodalla Shire Council Akolele Sewerage Scheme Construction of a pressure sewer system at Akolele Detailed Design and Construction
SSWP017 Eurobodalla Shire Council Eurobodalla Unserved Villages - Feasibility Investigation of provision of sewerage services to unsewered villages of South Durras, congo, Mystery Bay, Central Tilba and Tilba Tilba Scoping Study
SSWP018 Tweed Shire Council Tweed District Water Supply - Mitigation of the Risk of Salt Water Contamination Investigation of the mitigation of the risk of salt water contamination of the Tweed District drinking water supply Scoping Study
SSWP023 Walgett Shire Council Collarenebri Pre-treatment and Sludge Handling Investigation of existing infrastructure and options to improve pre-treatment at the Collarenebri Water Treatment Plant to reduce water quality risk Scoping Study
SSWP025 Coolamon Shire Council Coolamon Sewerage Augmentation Augmentation of the existing Coolamon Sewage Treatment Plant to improve treatment process Business Case
SSWP026 Wentworth Shire Council Wentworth Water Treatment Plant Augmentation Identification of infrastructure deficiencies at the Wentworth Water Treatment Plant and development of options to improve facility Scoping Study
SSWP027 Snowy Monaro Regional Council Bombala Sewerage Augmentation Augmentation of the existing Sewage Treatment Plant to improve treatment process Detailed Design and Construction
SSWP028 Kempsey Shire Council Crescent Head Water Treatment Plant Construction of a new Water Treatment Plant to supply Crescent Head Detailed Design and Construction
SSWP029 Oberon Council Oberon and East Oberon Sewerage Scheme Augmentation of the existing Sewage Treatment Plant to improve treatment process and construction of a reticulation system at East Oberon Detailed Design and Construction
SSWP030 Wentworth Shire Council Gol Gol Water Treatment Plant Installation of automated electrical and telemetry control systems at the Gol Gol Water Treatement Plant to improve water quality and safety Detailed Design and Construction
SSWP031 Lockhart Shire Council Lockhart Sewage Treatment Plant Construction of a new Intermittently Decanted Extended Aeration treatment process to replace existing trickling filter Scoping Study
SSWP032 Coonamble Shire council Gulargambone and Quambone Drinking Water Improvement Installation of chlorine monitoring and telemetry equipment Business Case
SSWP033 Walgett Shire Council Lightning Ridge Water Supply Upgrade Construction of a cooling tower and disinfection system Detailed Design and Construction
SSWP034 Port Macquarie-Hastings Shire Council Port Macquarie-Hastings Bulk Water Filtration Plant Investigations into options for bulk water treatment for the Port Macquaire-Hastings LGA Scoping Study
SSWP036 Carrathool Shire Council Rankins Springs Water Upgrades Rehabilitation and capacity improvement of raw water storage dams, including strengthening, desilting and sealing to prevent water loss Scoping Study
SSWP037 Bogan Shire Council Nyngan Water Treatment Plant and Distribution System Upgrade Upgrade of treatment facilities at the Nyngan Water Treatment Plant Detailed Design and Construction
SSWP038 Gilgandra Shire Council Gilgandra Water Supply Augmentation Construction and augmentation of reticulation system and Gilgandra Water Treatment Plant Business Case
SSWP039 Gilgandra Shire Council Gilgandra Sewerage System Rehabilitation Construction of a new Sewage Treatment Plant, pumping stations, sewer mains and associated works Business Case
SSWP041 Richmond Valley Shire Council Casino Secure Water Supply Options assessment study for a secure emergency raw water supply for Casino Scoping Study
SSWP042 Griffith City Council Griffith Water Treatment Plant Upgrades Upgrades of filtration system, dissolved air flotation system, powdered activated carbon dosing system and raw water storage at Griffith Water Treatment Plant Scoping Study
SSWP044Wingecaribee Shire CouncilBowral Sewage Treatment PlantUpgrade of existing Sewage Treatment Plant to increase treatment capacity and improve effluent qualityDetailed Design and Construction
SSWP045Central Tablelands WaterCentral Tablelands Water SecurityConstruction of a new 12ML reservoir at Carcoar Water Treatment Plant and construction of a new 23km pipeline from Gooloogong to GlenfellDetailed Design and Construction
SSWP046Nambucca Shire CouncilBowraville Off-River Storage DamScoping study to address water quality for the Nambucca Shire water supply systemScoping Study
SSWP047Gwydir Shire CouncilBingara Sewerage ExtensionProvision of reticulated sewerage to East Bingara and North Bingara villages. Includes upgrade of some facilities at the Bingara Sewage Treatment PlantBusiness Case
SSWP048Narrabri Shire CouncilNarrabri Sewage Treatment PlantUpgrade of existing Sewage Treatment Plant to contemporary standards, including addressing Workplace Health and Safety requirementsBusiness Case
SSWP049Bourke Shire CouncilCharles Street Reservoir RenewalRenewal of the existing Charles Street reservoir to improve drinking water qualityDetailed Design and Construction
SSWP051Bourke Shire CouncilSafe and Secure Water for Rural and Remote Villages of the Bourke LGAConstruction of new bores at Byrock, Enngonia, Louth and Wanaaring villagesDetailed Design and Construction
SSWP053Bega Valley Shire CouncilBrogo-Bermagui Water Treatment PlantConstruction of a new Water Treatment Plant to service Brogo-BermaguiDetailed Design and Construction
SSWP054Coonamble Shire CouncilCoonamble Sewage Treatment PlantScoping study to investigate replacement of the Coonamble Sewage Treatment PlantScoping Study
SSWP055Wingecaribee Shire CouncilMoss Vale Sewage Treatment PlantUpgrade of existing treatment facilities at the Moss Vale Sewage Treatment Plant, including construction of an additional IDEA tankDetailed Design and Construction
SSWP056Tweed Shire CouncilProvision of Water Security links to SEQ Water GridScoping study to investigate links to SEQ Water to provide water security for Tweed Shire CouncilScoping Study
SSWP058Snowy Monaro Regional CouncilAdaminaby Sewage Treatment Plant UpgradesConstruction of a modern IDEA tank and associated upgrade worksDetailed Design and Construction
SSWP059Armidale Regional CouncilDumaresq Dam Safety UpgradeDam upgrade works at Dumaresq Dam to reduce flood consequence hazardDetailed Design and Construction
SSWP060Armidale Regional CouncilArmidale Wastewater Campus ProjectAugmentation of existing Sewage Treatment Plant and effluent irrigation infrastructure, including provision of modern technologiesBusiness Case
SSWP061Armidale Regional CouncilPuddledock Dam Raw Water Transfer System AugmentationAugmentation of the raw water transfer system for Puddledock Dam to improve reliability as a backup supplyBusiness Case
SSWP062Warrumbungle Shire CouncilBaradine Water Treatment Plant UpgradeAugmentation of the existing Water Treatment Plant with a new clarification unitDetailed Design and Construction
SSWP063Warrumbungle Shire CouncilMendooran Water Supply Modification UpgradeUpgrade of the existing Water Treatment Plant to redesign, reconfigure and replace elements to improve treatment process by addressing process control, operation, and automation issuesBusiness Case
SSWP064Warrumbungle Shire CouncilMendooran Sewage SchemeScoping study to identify and develop cost effective options for a suitable sewerage scheme at MendooranScoping Study
SSWP065Gwydir Shire CouncilGravesend Water Supply UpgradeScoping study to investigate water treatment options for GravesendScoping Study
SSWP066Warrumbungle Shire CouncilSCADA and Telemetry Network Upgrade - Design and ConstructReplacement of two existing SCADA systems and telemetry networks to facilitate holistic LGA management of water and wastewater networksDetailed Design and Construction
SSWP070Bega Valley Shire CouncilBega/Tathra Water Treatment PlantConstruction of a Water Treatment Plant to service Bega/Tathra, including water stabilisation, chlorination and flouridationScoping Study
SSWP071Bega Valley Shire CouncilYellow Pinch Dam Water Treatment PlantScoping study to investigate construction of a Water Treatment Plant at Yellow Pinch Dam to service 12,000 people in the southern portion of the Bega Valley LGAScoping Study
SSWP072Murrumbidgee Irrigation LimitedEast Mirrool En-route Surge ReservoirConstruction of a 1500ML gravity-fed en-route storage to secure town water supply for Griffith, Yenda and irrigation farmsDetailed Design and Construction
SSWP073Murrumbidgee Irrigation LimitedRoaches En-route Surge ReservoirConstruction of a 3000ML en-route storage to secure town water supply for Leeton, surrounding villages and irrigation farmsDetailed Design and Construction
SSWP074Upper Hunter Shire CouncilUpper Hunter Water Supply and Water TreatmentScoping study to review options for supplying drinking water to Upper Hunter townships from Glenbawn Dam, including catchment, water quality and hydraulic assessmentScoping Study
SSWP075Snowy Monaro Regional CouncilJindabyne and Jindabyne East Water Filtration PlantsScoping study to investigate augmentation of the Jindabyne Water Intake Pump Station, construction of a filtration plant, and recommissioning of the High Zone Reservoir to service Jindabyne and Jindabyne EastScoping Study